ETO-to-CTO transformation for an industrial equipment manufacturer
Reduce costs and lead times on a UPS product range through platforming and modularisation, shifting from Engineering-to-Order to Configure-to-Order.
–20% direct cost reduction, –25% delivery lead time. Target reached in 18 months.
Results monitored and reported to PE sponsor throughout.